Blog

Blog

16 Jan,2026

2024

The atmospheric-pressure hydrogen electrolyzer has rolled off the production line.

2024

16 Jan,2026

2023

Delivery of a single 30,000-ton-per-year caustic soda electrolyzer.

2023

16 Jan,2026

2019

The Jiangyin Ligang plant has been commissioned.

2019

16 Jan,2026

2015

Through technology transfer, the AZEC-B1 electrolyzer was introduced, leading to the development of the ADE-B1 bipolar-cell ion-exchange membrane electrolyzer.

2015

16 Jan,2026

2014

The Jiangyin Shizhuang factory was commissioned on New Year’s Day.

2014

16 Jan,2026

2011

The first retrofitted ion-exchange membrane electrolyzer has been commissioned and is now in operation in Shandong.

2011
< 12 >